Crayfields

Office Refurbishment - Kent

Full office refurbishment – to supply and install all equipment

obligation
Suitable provision to ensure an ambient operating temperature of between +5°C and +40°C
requirement
For the installation of the air conditioning systems to be exposed
manufacturer
Daikin
installation
VRV comfort cooling/heating systems and a twin split system
timescale
8 Weeks

The Brief

The mechanical works for this office refurbishment in Kent included the following:

  • Installation of a new contemporary and exposed 410a based Daikin VRV comfort cooling/heating systems to serve the first-floor open plan office area
  • Installation of a dedicated twin split system that has its own controller with time clock in the reception area
  • To install in-line toilet extract fans within the ceiling voids, connecting to a galvanised ductwork system on the first floor
  • Ensure that the in-line toilet extract fans were controlled by a continual programmable time clock/PIR
  • Single ceiling mounted fans have been mounted within the ground floor toilets, which are controlled from the lighting circuits
  • Amend the refrigerant charge according to the pipe measurements
  • Carry out a pressure and evacuation test on all the systems
  • Air balancing was completed to ensure that the system was meeting the design criteria
  • All testing for the air conditioning systems has been supported by accompanying documentation including certificates
  • Drawings and an operation and maintenance manual were included as per the criteria
  • An F-Gas logbook has been completed and included as standard

Related Projects

Crayfields

Crayfields

commercial project

Installation of exposed air conditioning systems

Castle Lane

Castle Lane

commercial project

Supply and install all heating and cooling systems

Earlsfield

Earlsfield

residential project

Domestic pipework, supply and install the sanitary ware

Earlsfield - Plant Room

Earlsfield - Plant Room

residential project

The mechanical works for a New Housing Development Plant Room

London Bridge

London Bridge

commercial project

Various mechanical works including air conditioning, ventilation and plumbing

Peregrine House

Peregrine House

commercial project

Install of air conditioning, an air handling system, hot and cold-water services

Premier Park, West London

Premier Park, West London

commercial project

Adding additional units to the existing VRV system. BREEAM compliant

Little Mead

Little Mead

residential project

Underfloor heating, hot and cold-water services, heat recovery ventilation system and cellar cooling.

Plant room - North London

Plant room - North London

commercial project

Refurbish the schools plant room as existing boilers were failing and services needed updating

Caxton Street

Caxton Street

commercial project

Full office refurbishment – a supply and install of all the equipment

Lancaster Gate

Lancaster Gate

residential project

The refurbishment of a 225 sqm split-level apartment

Solent Gate

Solent Gate

commercial project

Full office/warehouse refurbishment – supply and install all equipment

Circus Street

Circus Street

residential project

Full refurbishment of communal facilities

Ely Place

Ely Place

commercial project

Full office refurbishment

India House

India House

commercial project

Full office refurbishment