Caxton Street

Office Refurbishment – Central London

Full office refurbishment – a supply and install of all the equipment

obligation
To ensure efficient heat/cool and ventilation
manufacturer
Daikin
installation
: VRV comfort cooling/heating systems with enhanced supply standards of mechanical fresh air to all floors.
timescale
24 weeks

The Brief

The mechanical works for this central London office refurbishment included the following:

  • This project we have been asked to design, supply, and install new variable refrigerant flow (VRF) systems to serve the first-floor office and ground floor offices.
  • The outdoor condenser units have been installed within the external plant compound on the roof, for which a specialist crane lift was required
  • Carry out a pressure and evacuation test on all the systems
  • Supplied and installed new mechanical ventilation with heat recovery units (MVHR) to serve first-floor open plan office.
  • Supply and installation of new toilet/shower extract fans which includes extract air fans, volume control dampers, ductwork, smoke dampers, grilles/valves, louvers, and time clock control. The fan is situated on the first-floor mezzanine area.
  • Supplied and installed a BMS panel situated on first floor Mezzanine which monitors the power consumptions off the electric meter and water meter, it also controls the toilet extract fan on a time clock.
  • Air balancing was completed to ensure that the system was meeting the design criteria
  • All testing for the air conditioning systems has been supported by accompanying documentation including certificates
  • Drawings and an operation and maintenance manual were included as per the criteria

Other Projects

London Bridge

London Bridge

commercial project

Various mechanical works including air conditioning, ventilation and plumbing

Peregrine House

Peregrine House

commercial project

Install of air conditioning, an air handling system, hot and cold-water services

Plant room - North London

Plant room - North London

commercial project

Refurbish the schools plant room as existing boilers were failing and services needed updating